Sequential Excavation of a Soft-Ground Tunnel
Description
The sequential stages of excavation and structural lining components used in soft-ground tunneling methods.
8 Terms
Show in diagram
Bench excavation
Final lining
Initial lining
Invert excavation
Pilot excavation
Temporary support
Top heading
Waterproof membrane